Skip to main content
Intercity ExpressChattogramDhaka TimetableHalted at Platform (স্টেশনে অবস্থান)Off Day: Daily
BST: 16:37:18 (Friday)

Mahanagar Godhuli (703)

মহানগর গোধূলীRoute: Chattogram to Dhaka (~321 km) • Scheduled Departure: 15:00 BST, Arrival: 20:45 BST (5h 45m)

Live Position Status • এখন কোথায়?

Currently Halted at Platform: Gunabati

Off Day: Daily
Chattogram(15:00)
28% Completed (~321 km total)
(20:45)Dhaka
Origin: ChattogramDestination: Dhaka
Estimated Speed
~0 km/h
Nearest / Next Station
Gunabati
Next Station ETA
At Schedule
Punctuality Rating
20% On-Time
Official Bangladesh Railway Service • এসএমএস কোড

Track Mahanagar Godhuli (703) Live via 16318 SMS

Bangladesh Railway trains are equipped with onboard satellite transponders. To receive the official real-time GPS coordinates and delay update directly to your phone, send an SMS with the train code below to 16318.

SMS Code:TR 703
Open in SMS
Universal operator support: Grameenphone, Banglalink, Robi, Airtel, Teletalk.Official fee: ৳4.00 + applicable government VAT per SMS.
Service Overview & Background

About Mahanagar Godhuli (মহানগর গোধূলী)

Division: Eastern Zone

Mahanagar Godhuli (মহানগর গোধূলী) represents the afternoon/sunset express corridor between Dhaka and Chattogram.

বাংলা পরিচিতি:গোধূলিলগ্নে ঢাকা ও চট্টগ্রামের মধ্যে চলাচল করায় এই আন্তঃনগর ট্রেনের নাম রাখা হয়েছে গোধূলী।

Mahanagar Godhuli operates under the Eastern administrative division of Bangladesh Railway, covering a total track distance of approximately ~321 km (199 miles). It connects origin Chattogram with destination Dhaka in approximately 5h 45m.

Corridor Quick Facts

  • Train Number:#703
  • Train Type:intercity
  • Total Distance:~321 km
  • Total Stoppages:10 Stations
  • Return Train:#704
Ticket Prices & Travel Classes • টিকিট মূল্য ও শ্রেণি

Mahanagar Godhuli Ticket Price (Chattogram to Dhaka)

Official BR rates calculated for ~321 km

Below is the comprehensive ticket price guide for all passenger accommodation classes available on Mahanagar Godhuli (703). Fares reflect standard Bangladesh Railway distance tariffs plus applicable 15% VAT on AC chair and berth accommodation.

S_CHAIRশোভন চেয়ার

Shovon Chair

295 to ৳325

Non-AC reserved individual cushioned seat. The most popular, reliable, and cost-effective travel class for intercity journeys.

Layout: 2x2 or 2x3 cushioned bucket seat with window curtain
Reserved SeatFan CooledWindow ArmrestAffordable Comfort
SNIGDHAস্নিগ্ধা (এসি চেয়ার)

Snigdha (AC Chair)

683 to ৳738

Fully air-conditioned luxury chair car with spacious reclining seats, luggage racks, and onboard power outlets for devices.

Layout: 2x2 ergonomic reclining seat with personal mobile charging port
Full Air ConditioningReclining BackrestMobile Charging PortWide Legroom
AC_Sএসি সিট (কেবিন)

AC Seat (Cabin)

831 to ৳897

Air-conditioned private compartment seating. Highly recommended for families, couples, and travelers seeking quiet privacy.

Layout: 2-berth coupe or 4-berth closed cabin with lockable sliding door
Lockable Privacy DoorCentral ACReading LightsFamily Cabin Seating
AC_Bএসি বার্থ (স্লিপার)

AC Berth (Sleeper)

1287 to ৳1390

Full flat sleeping bunk equipped with clean bedsheets, pillow, and blanket. Ideal for overnight trips between North Bengal/Sylhet and Dhaka.

Layout: Full flat sleeper bunk with fresh bedsheet, pillow, and blanket
Full Flat Sleeping BerthFresh Bedding IncludedAir ConditionedOvernight Rest
How to Book Online Tickets (ই-টিকিট বুকিং নিয়মাবলী)

Tickets open 10 days before departure at 08:00 AM BST (Western Zone) and 02:00 PM BST (Eastern Zone) via eticket.railway.gov.bd or the Rail Sheba app. Read our step-by-step online ticket booking guide, check seat class differences, and review Bangladesh Railway fare charts.

Book on Official Portal
Coach Composition & Seat Layout • বগি বিন্যাস

Mahanagar Godhuli Bogie Position & Seat Plan

Standard Rake Formation (রেক কম্পোজিশন)

Bangladesh Railway rakes are arranged sequentially from the locomotive to the rear brake van. Coaches are designated with Bengali alphabet letters (ক, খ, গ, ঘ, ঙ, চ, ছ, জ, ঝ...). Review the typical coach layout below before boarding:

Locomotive
Power Car (বিদ্যুৎ)
Shovon Chair (ক-ঘ)
Pantry / Meal (ঙ)
Snigdha AC (চ-ছ)
AC Cabin / Berth (জ-ঝ)
Guard Van (ব্রেক)
Locomotive EngineFront Head (সামনে)
লোকোমোটিভ ইঞ্জিনN/A

Heavy-duty Class 2900 / 3000 / 3200 diesel-electric locomotive powering the train.

Power Car & Guard VanAdjacent to Engine
পাওয়ার কার ও গার্ড ভ্যানUtility / Luggage

Onboard diesel generator supplying 415V 3-phase power for coach air conditioning and lighting.

Shovon Chair CoachesKa, Kha, Ga, Gha, Uma (ক, খ, গ, ঘ, ঙ)
শোভন চেয়ার বগি (নন-এসি)60 Seats (2x2 / 2x3)

Non-AC reserved coaches with cushioned bucket seats, large windows, and ceiling fans.

Snigdha AC Chair CoachesCha, Chha (চ, ছ)
স্নিগ্ধা এসি চেয়ার বগি48-52 Seats (2x2)

Modern Chinese CRRC / Indonesian PT INKA air-conditioned coaches with ergonomic reclining seats and charging ports.

AC Cabin & Sleeper BerthsJa, Jha (জ, ঝ)
এসি কেবিন ও স্লিপার বগি32-36 Berths

Private compartments featuring 4-berth cabins and 2-berth coupes with lockable doors and clean bedding.

Rear Brake Van / PantryRear Coach (সবশেষে)
রিয়ার ব্রেক ভ্যান / প্যান্ট্রি কারDining / Crew

Catering pantry car and guard cabin with emergency braking mechanisms.

Seat Plan Tip: In Shovon Chair coaches, seats 1–30 are typically in the forward half, with window seats ending in odd/even pairs depending on the coach manufacturer (CRRC vs PT INKA). In AC Cabins, cabins 'Ka' through 'Gha' offer lockable 4-berth or 2-berth arrangements. Explore our detailed Bangladesh Railway seat plan & coach layout guide.
Operating Days & Holiday • সাপ্তাহিক বন্ধ

Mahanagar Godhuli Off Day Schedule (Daily)

Runs 7 Days a Week

Mahanagar Godhuli (703) operates daily throughout the year without any scheduled weekly off-day closure. The counterpart return train Mahanagar Provati (#704) has its weekly off day on Daily.

SatRuns
SunRuns
MonRuns
TueRuns
WedRuns
ThuRuns
FriRuns
Passenger Alert: During special government Eid holidays or national festival rush, Bangladesh Railway often suspends weekly off-days and runs special services. Check official BR notices before festival travel.
Popular Boarding Points & Junctions • স্টপেজ চেক

Does Mahanagar Godhuli Stop at Your Station?

Key junction stops along ChattogramDhaka

Check whether Mahanagar Godhuli halts at prominent railway junction stations on its corridor. Passengers can board or alight at any station listed with scheduled arrival and halt times:

Dhaka Airport
ঢাকা বিমানবন্দর
Arrival: 20:15 (3m halt)
Stops
Bhairab Bazar
ভৈরব বাজার জংশন
Arrival: 19:05 (3m halt)
Stops
Brahmanbaria
ব্রাহ্মণবাড়িয়া
Arrival: 18:41 (4m halt)
Stops
Akhaura
আখাউড়া জংশন
Arrival: 18:20 (3m halt)
Stops
Cumilla
কুমিল্লা
Arrival: 17:27 (2m halt)
Stops
Feni
ফেনী জংশন
Arrival: 16:20 (2m halt)
Stops
All Station Stoppages & Timetable • সম্পূর্ণ স্টপেজ

Mahanagar Godhuli (703) Station List & Timetable

Full list of all 10 scheduled stops with arrival, departure, and halt duration.

#Station NameArrivalDepartureHaltStatus
ChattogramOrigin
চট্টগ্রাম
15:00TerminalPassed
Feni
ফেনী
16:2016:222m haltPassed
Gunabati
গুণবতী
16:3616:382m haltCurrent Stop
4
Laksam
লাকসাম
17:0417:062m haltUpcoming
5
Cumilla
কুমিল্লা
17:2717:292m haltUpcoming
6
Akhaura
আখাউড়া
18:2018:233m haltUpcoming
7
Brahmanbaria
ব্রাহ্মণবাড়িয়া
18:4118:454m haltUpcoming
8
Bhairab
ভৈরব বাজার
19:0519:083m haltUpcoming
9
Dhaka Airport
ঢাকা বিমানবন্দর
20:1520:183m haltUpcoming
10
DhakaDestination
ঢাকা
20:45TerminalUpcoming
Looking for all train options and fare details between Chattogram and Dhaka?View Full ChattogramDhaka Schedule & Fares

Punctuality & Delay Analysis

Historical on-time running trends based on recent Bangladesh Railway logs.

20% On-Time Record
Average Trip Delay
~49 minutes
Typical operational variance
Max Recorded Delay
~75 minutes
Peak congestion delay
Total Journey Halts
10 Stations
Scheduled boarding points
Schedule Delay or Disruption? In case of severe train delays or train cancellation by Bangladesh Railway, passengers are entitled to counter refunds. Read the full Bangladesh Railway ticket refund rules & cancellation timeline.
Common Passenger Queries • প্রশ্নোত্তর

Frequently Asked Questions about Mahanagar Godhuli

Where is Mahanagar Godhuli (703) right now? (মহানগর গোধূলী এখন কোথায়?)
Mahanagar Godhuli (703) is currently halted at platform at Gunabati, scheduled to depart shortly according to its official timetable.
What is the official timetable and schedule for Mahanagar Godhuli? (মহানগর গোধূলী এর সময়সূচী)
Mahanagar Godhuli (703) departs Chattogram at 15:00 BST and reaches Dhaka at 20:45 BST. Total estimated travel time is 5h 45m covering approximately 321 km with scheduled halts across 10 stations.
What is the weekly off day for Mahanagar Godhuli? (মহানগর গোধূলী এর অফ ডে কবে?)
Mahanagar Godhuli (703) operates daily (7 days a week) with no weekly off day.
What are the ticket prices for Mahanagar Godhuli (Chattogram to Dhaka)? (মহানগর গোধূলী টিকিটের মূল্য ও ভাড়া)
Estimated Bangladesh Railway ticket prices for Mahanagar Godhuli between Chattogram and Dhaka are: Shovon Chair: ৳295–৳325, Snigdha (AC Chair): ৳683–৳738, AC Seat (Cabin): ৳831–৳897, AC Berth (Sleeper): ৳1287–৳1390. These rates include base track distance fare and 15% VAT on air-conditioned seating. Fares may vary slightly depending on boarding station.
What are all the stoppage stations for Mahanagar Godhuli? (মহানগর গোধূলী কোথায় কোথায় থামে / স্টপেজ তালিকা)
Mahanagar Godhuli has 10 scheduled stoppages along the Chattogram to Dhaka rail corridor. Major boarding points include Chattogram, Feni, Gunabati, Laksam, Cumilla, Akhaura. You can search and filter the full timetable on this page.
Does Mahanagar Godhuli stop at major junction stations like Joydebpur or Dhaka Airport?
Mahanagar Godhuli stops at: Dhaka Airport (20:15), Bhairab Bazar (19:05), Brahmanbaria (18:41), Akhaura (18:20), Cumilla (17:27), Feni (16:20).
How can I track Mahanagar Godhuli live via SMS using code 16318? (মহানগর গোধূলী ট্র্যাকিং কোড)
To get Bangladesh Railway's official locomotive satellite GPS report on your phone, send an SMS with "TR 703" to 16318 from any Bangladeshi mobile SIM (Grameenphone, Banglalink, Robi, Airtel, Teletalk). Universal operator charge is ৳4.00 + VAT.
How do I book online tickets and check seat plan for Mahanagar Godhuli?
Official online ticket booking is available on the Bangladesh Railway portal (eticket.railway.gov.bd) and the "Rail Sheba" app. Tickets open 10 days in advance at 08:00 AM BST (Western Zone) / 02:00 PM BST (Eastern Zone). Up to 4 tickets can be booked per registered NID.
Essential Bangladesh Railway Travel Resources • প্রয়োজনীয় গাইড